Mayfield Berth 7

About project

The construction of Stolthavens’ new fueling berth.

Work carried out by SMADS:

  • Hydo blasting the sheet wall
  • Using the hydraulic grinder to prepare the surface
  • Welding in plates to the sheet pile wall
  • Installation of 400 450kg anodes
  • Underwater burning and cutting steel sheet wall to correct height
  • Concrete pour behind steel plates welded in
  • The supply of 5 dive teams with Nitrox with our portable system
  • Video surveys with reports of the job.

Project details

  • Category: Commercial Diving Marine Construction
  • Location:Newcastle
  • Duration:01/2018 – 10/2018