About project
The construction of Stolthavens’ new fueling berth.
Work carried out by SMADS:
- Hydo blasting the sheet wall
- Using the hydraulic grinder to prepare the surface
- Welding in plates to the sheet pile wall
- Installation of 400 450kg anodes
- Underwater burning and cutting steel sheet wall to correct height
- Concrete pour behind steel plates welded in
- The supply of 5 dive teams with Nitrox with our portable system
- Video surveys with reports of the job.
Project details
- Category: Commercial Diving Marine Construction
- Location:Newcastle
- Duration:01/2018 – 10/2018